Launch different jobs in different times (need only 1 hit for everyjob)

i will launch 12 jobs in different times, i need everyjob to reach only 1 HIT and to be stopped directly.

So the 12 jobs in total to be 12 hits only, (every job can reach only max 1 hit)

how to make it ?

You have to configure a start condition for each of them, and then configure triggers in the job monitor to stop them after 1 hit.

1 Like